Preview – work in progress
Portable cabins · Modular buildings · Site camps

Built in our factory.
Ready on your site.

NAS engineers and manufactures portable cabins, workforce accommodation and modular buildings in Saudi Arabia — designed for 50 °C summers, delivered to all 13 regions and installed by our own crews.

Years of manufacturing
15+
Units delivered
12,000+
Factory floor area
40,000 m²
Regions served across KSA
13
About NAS

A Saudi manufacturer of modular space — from steel coil to finished building.

Engineering, steel fabrication, panel production, MEP fit-out and installation all happen under one roof. That control is how we hold tolerances, keep lead times short and stand behind every unit that leaves our gates.

  • In-house design & structural engineering
  • CNC steel fabrication & coating lines
  • Factory-fitted electrical, plumbing & HVAC
  • Own fleet, cranes and installation crews
3D Configurator

Design your cabin. See it in 3D. Get it quoted.

Choose dimensions, connect modules, place doors and windows, plan the interior and select finishes — then send the exact design to our engineers for a quotation.

  • Real-time 3D on desktop and mobile
  • Doors, windows, partitions & rooms
  • Finishes, roof styles, A/C & electrical
  • Save, share and request a quotation

The 3D configurator is still being built.

Industries

Trusted where the work is hardest.

From remote oil & gas sites to city-centre government projects, our buildings are specified to each sector’s safety and operating standards.

Projects

Delivered across the Kingdom.

A selection of recent camps, offices and modular facilities.

  • Contractor Site Camp — 850 Persons
    Construction

    Contractor Site Camp — 850 Persons

    A complete camp for 850 workers including accommodation blocks, kitchen and dining hall, mosque, laundry, clinic and site offices. Manufactured in parallel production lines and installed in three phases to match the contractor’s mobilisation plan.

    Location
    Riyadh Province
    Completed
    2024
    Modules
    142 units
    Capacity
    850 persons
    Scope
    Design, manufacture, installation, MEP
    Programme
    14 weeks
    Request a Quotation
  • Staff Accommodation Complex
    Industrial

    Staff Accommodation Complex

    Two-storey accommodation blocks with 2-person en-suite rooms, external steel stairs and covered walkways, finished with 75 mm PU insulation for long-term occupation in coastal humidity.

    Location
    Jubail Industrial City
    Completed
    2023
    Modules
    96 units
    Rooms
    192 en-suite rooms
    Configuration
    G+1 blocks
    Insulation
    75 mm PU panels
    Request a Quotation
  • Modular Office Complex
    Commercial

    Modular Office Complex

    A 2,400 m² office complex formed from 60 connected modules with open-plan workspaces, glazed meeting rooms, executive offices, pantries and washrooms — installed on site in 12 working days.

    Location
    Riyadh
    Completed
    2024
    Floor area
    2,400 m²
    Modules
    60 connected units
    Installation
    12 working days
    Finish
    ACP façade, raised flooring
    Request a Quotation
  • Remote Exploration Camp
    Oil & Gas

    Remote Exploration Camp

    A relocatable desert camp with fire-rated accommodation, kitchen and dining, recreation, clinic and power distribution — designed for sand ingress, extreme heat and relocation as the exploration programme moves.

    Location
    Rub’ al Khali
    Completed
    2023
    Capacity
    220 persons
    Modules
    58 units
    Panels
    100 mm rockwool, fire-rated
    Design
    Relocatable skid-mounted
    Request a Quotation
  • Modular Primary Healthcare Clinic
    Government

    Modular Primary Healthcare Clinic

    A single-storey modular clinic with reception, consultation rooms, treatment room, pharmacy and accessible washrooms, featuring medical-grade wall finishes, seamless vinyl flooring and full MEP installed in the factory.

    Location
    Al-Ahsa
    Completed
    2025
    Floor area
    420 m²
    Modules
    14 units
    Finishes
    Hygienic wall panels, seamless vinyl
    Delivery
    9 weeks from approval
    Request a Quotation
  • Site Offices & Welfare Facilities
    Construction

    Site Offices & Welfare Facilities

    Office cabins, meeting rooms, toilet and ablution blocks and shaded rest areas supplied for a remote project in the north-west, with timber-effect cladding to sit sensitively within the landscape.

    Location
    Tabuk Region
    Completed
    2025
    Modules
    38 units
    Cladding
    Timber-effect façade
    Facilities
    Offices, WC & ablution, rest areas
    Programme
    8 weeks
    Request a Quotation
Manufacturing

Factory-built quality you can inspect.

Every unit moves through a controlled six-stage process with documented inspection at each step — so what arrives on site is exactly what was approved on paper.

  1. 01

    Design & engineering

    Layouts, structural and MEP drawings prepared and approved before production starts.

  2. 02

    Steel fabrication

    CNC-cut sections, jig-welded base and roof frames, shot-blasted and coated.

  3. 03

    Panels & envelope

    Sandwich wall and roof panels installed, sealed and waterproofed.

  4. 04

    MEP & fit-out

    Electrical, plumbing, HVAC, flooring, ceilings and joinery installed in the factory.

  5. 05

    Inspection & testing

    Dimensional, electrical and water-tightness tests recorded on a QC sheet per unit.

  6. 06

    Delivery & installation

    Transported, crane-placed, levelled, connected and handed over by our crews.

ISO 9001:2015 Quality ManagementSaudi Building Code (SBC) compliant designSASO-conforming componentsCivil Defense–approved materials100% Saudi manufactured

Ten cabins next week or a 1,000-person camp next quarter?

Tell us what you need. Our engineers will come back with a layout, specification and quotation within one working day.

Quotation request

Fields marked * are required.

Requirement

Chat on WhatsApp